ES ExxonMobil starts production at Uaru, Guyana's fifth offshore oil project, lifting installed capacity in the Stabroek block to 1.1 million barrels a day
ExxonMobil began producing oil at Uaru, the fifth development in Guyana's offshore Stabroek block, on Monday 16 November 2026, the company said in a statement that day, as reported by The Rio Times. The start-up lifts the country's installed production capacity to 1.1 million barrels a day; ExxonMobil said on 12 November that the four earlier projects produce about 900,000 barrels a day. The new floating production, storage and offloading vessel, Errea Wittu, can store two million barrels and is expected to reach its initial capacity of 250,000 barrels a day in the first quarter of 2027; contractor MODEC said it reached first oil ahead of schedule. ExxonMobil Guyana operates Stabroek with a 45% stake; Hess Guyana Exploration holds 30% and China's CNOOC 25%. Guyana's Ministry of Natural Resources has described Uaru as a US$12.7 billion project targeting more than 800 million barrels of recoverable oil. The figures are installed capacity, not current output, and The Rio Times had not found a Guyanese government announcement of the start-up.
Place: Stabroek block, offshore Guyana
View the country context in World →
- Occurred
- 16 Nov 2026, 00:00 UTC
- Last updated by Valyzer
- Severity
- Medium
- Confidence
- 50%
- Verification
- Automated verification (no editorial review)
- Quality
- No warnings
- Evidence pieces
- 1
Confidence (50 %) estimates the strength of the reading; it does not substitute for verification.
Related entities
Facts
No claims beyond the headline have been published.
Relationships and impacts
Observed connections are separate from inferred impact mechanisms.
Observed relationships
Inferred impacts
Potential scenarios, not confirmed facts.
Inference · Undetermined
GuyanaNamed in the documented event; it does not establish a role, a favourable or adverse impact or its consequencesUndetermined
Horizon immediate · Confidence 50%Evidence for the inferred impact
- The Rio Times (opens in a new tab)Published 17 Nov 2026 · Retrieved 17 Nov 2026
Inference · Undetermined
ExxonMobilNamed in the documented event; it does not establish a role, a favourable or adverse impact or its consequencesUndetermined
Horizon immediate · Confidence 50%Evidence for the inferred impact
- The Rio Times (opens in a new tab)Published 17 Nov 2026 · Retrieved 17 Nov 2026
| Entity | Mechanism | Result | Horizon | Confidence |
|---|---|---|---|---|
| Guyana | Named in the documented event; it does not establish a role, a favourable or adverse impact or its consequences | Undetermined | immediate | 50% |
| ExxonMobil | Named in the documented event; it does not establish a role, a favourable or adverse impact or its consequences | Undetermined | immediate | 50% |
Sources consulted
Deduplicated evidence pieces behind this event. Sources are repeated only in the blocks that cite them.
Evolution and evidence
Browse what changed and what Valyzer knew at the selected cut. Comparisons use explicit versions, not page order.
- Valid at
- Known until
Publication Recorded
Public reason: Public reason unavailable
- Validity
- — current