valyzer
Economy · Production start

ES ExxonMobil starts production at Uaru, Guyana's fifth offshore oil project, lifting installed capacity in the Stabroek block to 1.1 million barrels a day

ExxonMobil began producing oil at Uaru, the fifth development in Guyana's offshore Stabroek block, on Monday 16 November 2026, the company said in a statement that day, as reported by The Rio Times. The start-up lifts the country's installed production capacity to 1.1 million barrels a day; ExxonMobil said on 12 November that the four earlier projects produce about 900,000 barrels a day. The new floating production, storage and offloading vessel, Errea Wittu, can store two million barrels and is expected to reach its initial capacity of 250,000 barrels a day in the first quarter of 2027; contractor MODEC said it reached first oil ahead of schedule. ExxonMobil Guyana operates Stabroek with a 45% stake; Hess Guyana Exploration holds 30% and China's CNOOC 25%. Guyana's Ministry of Natural Resources has described Uaru as a US$12.7 billion project targeting more than 800 million barrels of recoverable oil. The figures are installed capacity, not current output, and The Rio Times had not found a Guyanese government announcement of the start-up.

Technical recordView JSON in the API (opens in a new tab)ID 44b24928-4e8e-4ed4-99b5-511dd7380418

Place: Stabroek block, offshore Guyana

View the country context in World →

Occurred
16 Nov 2026, 00:00 UTC
First published by Valyzer
Last updated by Valyzer
Severity
Medium
Confidence
50%
Verification
Automated verification (no editorial review)
Quality
No warnings
Evidence pieces
1

Confidence (50 %) estimates the strength of the reading; it does not substitute for verification.

Related entities

Facts

No claims beyond the headline have been published.

Relationships and impacts

Observed connections are separate from inferred impact mechanisms.

Observed relationships

No evidenced relationships have been published for this event.

Inferred impacts

Potential scenarios, not confirmed facts.

Inference · Undetermined

GuyanaNamed in the documented event; it does not establish a role, a favourable or adverse impact or its consequencesUndetermined

Horizon immediate · Confidence 50%

Evidence for the inferred impact

Inference · Undetermined

ExxonMobilNamed in the documented event; it does not establish a role, a favourable or adverse impact or its consequencesUndetermined

Horizon immediate · Confidence 50%

Evidence for the inferred impact

Accessible causal chain
EntityMechanismResultHorizonConfidence
GuyanaNamed in the documented event; it does not establish a role, a favourable or adverse impact or its consequencesUndeterminedimmediate50%
ExxonMobilNamed in the documented event; it does not establish a role, a favourable or adverse impact or its consequencesUndeterminedimmediate50%

Sources consulted

Deduplicated evidence pieces behind this event. Sources are repeated only in the blocks that cite them.

Publication and correction history

1 publication · 0 corrections · latest update 17 Nov 2026, 12:34 UTC

View the full version history
  1. Publication

    Recorded

    Validity
    — current
    Record
    — current
    Snapshot of this version
    Title
    ExxonMobil starts production at Uaru, Guyana's fifth offshore oil project, lifting installed capacity in the Stabroek block to 1.1 million barrels a day
    Summary
    ExxonMobil began producing oil at Uaru, the fifth development in Guyana's offshore Stabroek block, on Monday 16 November 2026, the company said in a statement that day, as reported by The Rio Times. The start-up lifts the country's installed production capacity to 1.1 million barrels a day; ExxonMobil said on 12 November that the four earlier projects produce about 900,000 barrels a day. The new floating production, storage and offloading vessel, Errea Wittu, can store two million barrels and is expected to reach its initial capacity of 250,000 barrels a day in the first quarter of 2027; contractor MODEC said it reached first oil ahead of schedule. ExxonMobil Guyana operates Stabroek with a 45% stake; Hess Guyana Exploration holds 30% and China's CNOOC 25%. Guyana's Ministry of Natural Resources has described Uaru as a US$12.7 billion project targeting more than 800 million barrels of recoverable oil. The figures are installed capacity, not current output, and The Rio Times had not found a Guyanese government announcement of the start-up.
    Severity
    Medium
    Confidence
    50%
    Occurred
    — current
    Locations
    Stabroek block, offshore Guyana